Heavy Industry Panasonic Electric Taiwan

Panasonic Electric — Blower Integration with TECO Industry 4.0 Platform

Blower failures shut down without warning, compromising SMT line cleanliness and temperature control.

Panasonic Electric — Blower Integration with TECO Industry 4.0 Platform — field installation photo
Panasonic Electric Taiwan · Heavy Industry

01 The Problem

The Risk

Blower failures shut down without warning, compromising SMT line cleanliness and temperature control.

02 The OctosX Solution

Sensor & Edge

Thermalpas + TECO Group Industry 4.0 Machine Health Managing System (legacy SCADA).

Cloud Logic & Alerting

OctosX integrates via OPC-UA into TECO's dashboard: anomaly → auto work-order → LINE notification to technician.

03 The Outcome

Field Detection

Panasonic confirmed 90% reduction in unplanned blower downtime, transitioning from reactive to predictive maintenance.

See it in your plant

Could this case be your plant?

Tell us about your facility — busbars, motors, panels, coal blowers, chillers, whatever your highest-risk thermal interface is — and we'll show you what an OctosX deployment would look like.